Ratio Electric-Handleiding EV080-3 talen

SOLAR BOX / EV080 ENGLISH 21 ENGLISH 21 SOLAR BOX / EV080 5. Open bottom cover of the Charge Station (5 screws – see picture). Carefully brake out required cable opening for incoming power cable and charge cable. Use supplied M25 cable gland to fix power cable from the bottom. Use supplied grommet to fix power cable from the back. Use supplied M25 cable gland to fix charge cable. Fixed cable Outlet 6. Use 4 wood screws M4,5x35mm to mount Charging Station on the wall. The charging station should be installed between 0,80m and 1,20m from bottom to the ground. 7. Connect in-coming power to the left terminal block. Single Phase: L1=Brown N= Blue Earth=Green/Yellow 3 Phase: L1=Brown L2=Black L3=Grey N=Blue Earth=Green/Yellow 8. Connection Sensorbox V2 and CT’s The Sensorbox V2 has three inputs for CT’s (current transformers) and a voltage input to determine the direction of the current. The connection to the charging station is via a 4-pole plug. With the Sensorbox V2 it is possible to determine the direction of the current, this makes it possible to charge the EV with self-generated solar power. The voltage input (220V-240V) is not a power supply for the Sensorbox but serves to determine the direction of the measured current. The CT’s are placed just after the main fuse but before the connection of the solar panels. See page 23. This way it will be able to measure the

RkJQdWJsaXNoZXIy OTE5MDM=